Flin Flon, Manitoba in January on three month Basal Till sampling project using our Geomachine 100 (GM100) Multi Purpose Crawler in -55c weather sampling over top of the ice on a number of lakes and over land driving the machine via remote control to each location. Remote locations require extensive pre-planning to ensure completion of the job on time and on budget with maximum safety.